4.9 from 214 verified reviews (sample)

What clients actually mention

Almost nobody writes about the tile. They write about the drawing, the variation that was priced the same afternoon, and the fan that had been venting into the attic since 1988.

Google
4.9 from 128
Houzz
5.0 from 54
Angi
4.8 from 32
Denver homeowners at home after a bathroom remodel.
  • They drew the tile layout before ordering anything, and the cut course lands exactly where they said it would. Nobody has ever shown us a drawing like that.

    Marguerite OyelaranWashington Park · Full bathroom remodel
  • Found rot at the old tub flange on the first morning, photographed it, priced it by that afternoon. No drama and no surprise invoice at the end.

    Tomasz KrajewskiLittleton · Tub-to-shower conversion
  • Two other firms said a shared tub and shower floor could not be done. Meridian explained what it would take, then did it, then sent us the flood-test photos.

    Daniel WhitcombeCherry Creek · Primary ensuite
  • They kept the original 1936 hex floor and matched the repair so well I genuinely cannot tell which tiles are new.

    Ellis BergstromPark Hill · Full bathroom remodel
  • The pocket door was their suggestion. Twenty-six square feet and it is now the room guests actually mention.

    Priya RaghunathanHighlands · Powder room
  • I did not want a bathroom that announced my mother's hip to every visitor. Nobody who has seen it has mentioned the grab bars once.

    Hannah Delacroix-MbekiGolden · Accessible bathroom
  • Our fan had been venting into the attic since 1988. They showed us the frost on the sheathing and re-ducted it through the roof as part of the job.

    Serena Achebe-LindqvistLittleton · Tub-to-shower conversion
  • Eleven days start to finish and the site was swept every evening. The containment at the door actually worked.

    Gordon MatsushimaWashington Park · Tub-to-shower conversion
  • The herringbone floor was more expensive and they told us exactly why before we committed. I would rather have that conversation than a surprise.

    Beatriz NkemeluHighlands · Tile and flooring
  • Only mark against them is the lead time on the stone. Eleven weeks for a book-matched slab, which they warned us about, but it is still eleven weeks.

    Aaron FeldbuschCherry Creek · Primary ensuite
  • The heated floor mat had three resistance readings logged in the handover file. That level of record keeping is not normal and it should be.

    Ingrid HalvorsenPark Hill · Tile and flooring
  • They talked us out of moving the toilet, which would have been an easy upsell, and spent the money on the vanity instead. Right call.

    Chidi Okonkwo-BaptisteGolden · Full bathroom remodel

Reviews, names and rating counts on this page are sample content for a demonstration website.

The next one could be yours

Survey, drawing, fixed price, flood test, photographs. Same for every project, whatever the budget.

Bathrooms only · Licensed and insured in Colorado · 4.9 from 214 reviews (sample)

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.